| Table
of Contents |
|
| Document |
Filing Date |
Document Title |
Pages |
Photo |
|
| 131422 |
Nov 15, 2000 |
Photo of ruptured El Paso Natural Gas Company pipeline in crater at
Carlsbad, New Mexico, taken looking east |
|
1 |
| 159385 |
May 29, 2002 |
Photo #1 - pieces of ruptured pipe in NSTB lab |
|
1 |
| 159384 |
May 29, 2002 |
Photo #2 - wrinkle in pipe |
|
1 |
| 159386 |
May 29, 2002 |
Photo #3 - inside of pipe |
|
1 |
| 159387 |
May 29, 2002 |
Photo #4 - remaining pipeline at west end of crater |
|
1 |
| 159388 |
May 29, 2002 |
Photo #5 - concrete bridge and pipeline suspension bridges, taken from
east side of Pecos River |
|
1 |
| 159390 |
May 29, 2002 |
Photo #6 - line 1103, concrete bridge and pipeline suspension bridges,
taken from west side of Pecos River |
|
1 |
| 159391 |
May 29, 2002 |
Photo #7 - camping area on east side of Pecos River |
|
1 |
| 159396 |
May 29, 2002 |
Photo #8 - line 1103 at the concrete bridge, taken from east side of
Pecos River |
|
1 |
| 155257 |
Apr 11, 2002 |
Materials Laboratory Factual Report |
53 |
|
| 155896 |
Apr 16, 2002 |
Meteorology Factual Report |
3 |
|
| 157649 |
May 09, 2002 |
Survival Factors - Factual Report of Group Chairman |
6 |
|
| 157650 |
May 09, 2002 |
Survival Factors - Factual Report of Group Chairman; Revision 1 |
6 |
|
| 158658 |
May 16, 2002 |
Operations Group Chairman's Factual Report |
19 |
|
| 156660 |
Apr 26, 2002 |
Operations Group Chairman's Factual Report, Appendix 1 - New Mexico
Pipeline Explosion Seismic Signals |
7 |
|
| 156661 |
Apr 26, 2002 |
Operations Group Chairman's Factual Report, Appendix 2 - Controller's
Day and Night Shift Checklist |
3 |
|
| 156662 |
Apr 26, 2002 |
Operations Group Chairman's Factual Report, Appendix 3 - Selected Section
of EPNG Mainline District Map |
2 |
|
| 158860 |
May 20, 2002 |
Operations Group Chairman's Factual Report, Appendix 4 - South Controller's
Log of Operations |
3 |
|
| 156665 |
Apr 26, 2002 |
Operations Group Chairman's Factual Report, Appendix 5 - SCADA System
Events for 8/19/2000 |
111 |
|
| 158861 |
May 20, 2002 |
Operations Group Chairman's Factual Report, Appendix 6 - Coordinator's
Logs |
4 |
|
| 156695 |
Apr 27, 2002 |
Operations Group Chairman's Factual Report, Appendix 7 - Selected Compressor
Station Data contained in the 1999 FERC Report |
4 |
|
| 156697 |
Apr 27, 2002 |
Operations Group Chairman's Factual Report, Appendix 8 - RSPA Advisory
Bulletin, ADB-00-02 |
3 |
|
| 156698 |
Apr 27, 2002 |
Operations Group Chairman's Factual Report, Appendix 9 - Corrective
Action Order, CPF No. 420001004-H with cover letter |
9 |
|
| 156699 |
Apr 27, 2002 |
Operations Group Chairman's Factual Report, Appendix 10 - Notice of
Probable Violation Proposed Civil Penalty & Compliance Order |
18 |
|
| 156700 |
Apr 27, 2002 |
Operations Group Chairman's Factual Report, Appendix 11 - 12/10/2001
Correspondence on Risk Assessment, Pipeline Integrity Testing and Remediation |
70 |
|
| 159672 |
May 31, 2002 |
Internal Corrosion Training Group Chairman's Factual Report |
12 |
|
| 156703 |
Apr 27, 2002 |
Internal Corrosion Training Group Chairman's Factual Report, Appendix
1 - Bell-Hole Inspection Report Form |
2 |
|
| 156708 |
Apr 27, 2002 |
Internal Corrosion Training Group Chairman's Factual Report, Appendix
2 - EPNG Response to Information Request from NTSB |
6 |
|
| 158858 |
May 20, 2002 |
Internal Corrosion Training Group Chairman's Factual Report, Appendix
3 - Corrosion-Related Training 1997-2001 |
6 |
|
| 156710 |
Apr 27, 2002 |
Internal Corrosion Training Group Chairman's Factual Report, Appendix
4 - Cover Letter and First 13 pages (Training Section) of EPNG's October
12, 2001 Response to the NOPV |
16 |
|
| 155505 |
Apr 15, 2002 |
Compliance Inspections Factual Report |
12 |
|
| 157893 |
May 10, 2002 |
Compliance Inspections Factual Report - Attachment 1 (Part I) |
223 |
|
| 157191 |
May 04, 2002 |
Compliance Inspections Factual Report - Attachment 1 (Part II) |
172 |
|
| 157894 |
May 10, 2002 |
Compliance Inspections Factual Report - Attachment 1 (Part III) |
123 |
|
| 157895 |
May 10, 2002 |
Compliance Inspections Factual Report - Attachment 1 (Part IV) |
115 |
|
| 157194 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 2 - SII letter dated
2/1/99 from TP Morgan |
5 |
|
| 157195 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 3 - SII letter dated
4/19/00 from OPS (RB Felder) |
3 |
|
| 157196 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 4 - Summary of EPNG's
Efforts in the SII Pilot Program |
5 |
|
| 159437 |
May 29, 2002 |
Compliance Inspections Factual Report, Attachment 5, 1/27/98 Failure
of Line 1103 |
3 |
|
| 159438 |
May 29, 2002 |
Compliance Inspections Factual Report, Attachment 6, 9/29/96 Failure
of Line 1300 |
20 |
|
| 157199 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 7 - Meeting minutes
and other records of OPS inspections for the SII Pilot Program |
57 |
|
| 157200 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 8 - 1/31/2001 OPS
Inspection Report |
45 |
|
| 157201 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 9 - 4/18/98 to 4/20/98
OPS Inspection Report |
19 |
|
| 157202 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 10 - 4/16/99 letter
from T. Fortner and compliance letters |
41 |
|
| 157203 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 11 - Procedure from
the EPNG Quality Assurance Auditing Procedures Manual (2/4/99, revised
3/3/99) |
14 |
|
| 157204 |
May 05, 2002 |
Compliance Inspections Factual Report - Attachment 12 - Record forms
from the EPNG Quality Assurance Auditing Procedures Manual (2/4/99, revised
3/3/99) |
9 |
|
| 157294 |
May 06, 2002 |
Interview of Peter Duarte - 8/21/00 and 8/23/01 |
3 |
|
| 157218 |
May 05, 2002 |
Interview of Charlie Bobb-8/22/00 |
57 |
|
| 157219 |
May 05, 2002 |
Interview of Paul Magana-8/22/00 |
28 |
|
| 157220 |
May 05, 2002 |
Interview of Randy Abigt-8/22/00 |
90 |
|
| 157216 |
May 05, 2002 |
Interview of Bud Wilcox-8/22/00 |
5 |
|
| 157214 |
May 05, 2002 |
Interview of Charles Mathis-8/23/00 |
3 |
|
| 157217 |
May 05, 2002 |
Interview of David Zavala-8/23/00 |
5 |
|
| 157212 |
May 05, 2002 |
Interview of George Barta-8/24/00 |
4 |
|
| 157215 |
May 05, 2002 |
Interview of Enrique Salgado-8/25/00 |
4 |
|
| 157213 |
May 05, 2002 |
Interview of Larry Charlet-8/25/00 |
6 |
|
| 157205 |
May 05, 2002 |
Interview of Thomas Clinton-8/30/00 |
2 |
|
| 157206 |
May 05, 2002 |
Interview of Rick Little-8/30/00 |
5 |
|
| 157235 |
May 05, 2002 |
Interview of Richard Posey-8/30/00 |
2 |
|
| 157207 |
May 05, 2002 |
Interview of Arthur Thames-8/30/00 |
2 |
|
| 157208 |
May 05, 2002 |
Interview of Karl Norred-8/30/00 |
6 |
|
| 157210 |
May 05, 2002 |
Interview of Robert Babnick-8/30/00 |
6 |
|
| 157209 |
May 05, 2002 |
Interview of Issac Weaver-11/20/00 |
7 |
|
| 157233 |
May 05, 2002 |
Interview of Douglas Harrison-4/3/01 |
94 |
|
| 157228 |
May 05, 2002 |
Interview of Thomas Clinton-4/3/01 |
59 |
|
| 157229 |
May 05, 2002 |
Interview of Wayne Ritchie-4/3/01 |
37 |
|
| 157231 |
May 05, 2002 |
Interview of Henry Martinez-4/3/01 |
23 |
|
| 157221 |
May 05, 2002 |
Interview of Darrell Campbell-4/3/01 |
30 |
|
| 157234 |
May 05, 2002 |
Interview of Robert Babnick-4/4/01 |
64 |
|
| 157232 |
May 05, 2002 |
Interview of Larry Meyer-4/4/01 |
14 |
|
| 157225 |
May 05, 2002 |
Interview of Blaine Metzger-4/4/01 |
48 |
|
| 157227 |
May 05, 2002 |
Interview of George Bush-4/4/01 |
19 |
|
| 157222 |
May 05, 2002 |
Interview of Rolando Trevino-4/5/01 |
25 |
|
| 157223 |
May 05, 2002 |
Interview of Thomas Morgan-4/5/01 |
21 |
|
| 157224 |
May 05, 2002 |
Interview of Donald Payne-4/5/01 |
71 |
|
| 157226 |
May 05, 2002 |
Interview of Bruce Campbell-4/5/01 |
35 |
|
| 157230 |
May 05, 2002 |
Interview of James Ferguson-4/5/01 |
48 |
|
| 157211 |
May 05, 2002 |
Interview of John Cole-4/26/01 |
6 |
|
| 157293 |
May 06, 2002 |
Interview of Sgt. Danny Kiper - 8/27/2001 |
1 |
|
| 157105 |
May 03, 2002 |
Human Performance Factual Report |
13 |
|
| 160536 |
Jun 13, 2002 |
Human Performance Factual Report, Attachment 1- Night and Day South
Controller's Shift Logs |
4 |
|
| 160537 |
Jun 13, 2002 |
Human Performance Factual Report, Attachment 2- Keystone Mainline Station
Time Line |
3 |
|
| 157238 |
May 05, 2002 |
Human Performance Factual Report, Attachment 3 - System Events Log |
6 |
|
| 157239 |
May 05, 2002 |
Human Performance Factual Report, Attachment 4 - Medical Review Officer's
Reports |
4 |
|
| 160370 |
Jun 12, 2002 |
Human Performance Factual Report, Attachment 5 - EPNG's Explanation
for the Initial Decision Not to Test Control Center Employees |
4 |
|
| 160574 |
Jun 14, 2002 |
Pipeline System Configuration Factual Report |
10 |
|
| 158769 |
May 17, 2002 |
Pipeline System Configuration Factual Report - note regarding drawings |
1 |
|
| 160512 |
Jun 13, 2002 |
Pipeline System Configuration Report, Drawing 1103.1-4 |
1 |
|
| 160510 |
Jun 13, 2002 |
Pipeline System Configuration Report, Drawing 1103.5-15 Rev. 3 |
1 |
|
| 160507 |
Jun 13, 2002 |
Pipeline System Configuration Report, Drawing 1103-52+1980 Rev. 1 |
1 |
|
| 160506 |
Jun 13, 2002 |
Pipeline System Configuration Report, Drawing 1103-56+2818-1 Rev. A |
1 |
|
| 160504 |
Jun 13, 2002 |
Pipeline System Configuration Report, Drawing 1103-56+2818-2 Rev. A |
1 |
|
| 158751 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 1 - Engineering
Department, Codes and Standards, "MAOP Determination", Sheet 8 and 9 |
3 |
|
| 160612 |
Jun 14, 2002 |
Pipeline Configuration Factual Report - Appendix 2 - Survey Notes for
Line 1103 |
9 |
|
| 158753 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 3 - Thomas
P. Morgan 4/5/01 interview (page 17) |
2 |
|
| 158754 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 4 - Thomas
P. Morgan 4/5/01 interview (page 12) |
2 |
|
| 158755 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 5 - Letter
from El Paso to Richard Lopez (no date) and 8/24/00 e-mail from DL McFarden
to DR |
6 |
|
| 158756 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 6 - Chart
of pigging activities for line 1103 |
2 |
|
| 158757 |
May 16, 2002 |
Pipeline System Configuration Factual Report - Attachment 7 - 5/25/01
letter from El Paso to NTSB |
3 |
|